
Guangzhou factory · Replies within 24 hours (CST)
Contact Tuodiao CNC
Send the panel sizes, materials and daily volume you work with. An engineer replies with a machine configuration and a quotation, usually the same working day.
Ways To Reach Us
Bring us the job you are trying to speed up - the panel sizes, the material, the output you need per shift - and we will tell you which machine or line gets you there, and what it costs to run.
Factory Address
No. 108, Jinyang 1st Road, Jinhua Industrial Zone, Panyu District, Guangzhou, Guangdong Province, China
Open in Google MapsBusiness Hours
Monday - Friday 8:30 - 18:00 Saturday 9:00 - 12:00 Sunday Closed
CST · UTC+8
Send Us An Inquiry
Request a Quote
Tell us about your requirements and we'll get back to you within 24 hours.
What To Include For An Accurate Quote
Panel sizes and thickness
Your largest and smallest parts, and the thickness range you run.
Materials
Particle board, MDF, ply, solid wood or door panels - each changes the tooling.
Daily volume and shifts
Panels per day per shift, so the capacity calculation matches your real load.
Existing equipment
What you already have, and whether this machine has to join a line (barcode, conveyor, MES).
Workshop power and space
Supply voltage and the floor area available, before we quote options.
Destination and terms
Port of destination and whether you need FOB, CIF or DDP.
What Happens After You Send
Send your requirement
Use the form, WhatsApp or email. An engineer, not a reseller, reads it and asks the follow-up questions.
Replies within 24 hours
Configuration and quotation
You get a machine configuration with options and a footprint layout, backed by CE marking and our ISO 9001 / 14001 / 45001 system documentation.
CE marked · ISO triple system
See it running
Watch the machine in our Guangzhou workshop, in person or on a video call. Every unit also runs a 72-hour burn-in test before it ships.
72-hour burn-in before shipment
Delivery and commissioning
Factory-trained engineers install and commission on site and train your operators, typically 3-5 days.
30-45 days for standard models
Questions Buyers Ask First
What is the typical lead time for delivery?
Do you offer financing or leasing options?
Do you provide installation and training services?
What after-sales support do you provide?
What certifications do your machines have?
Can your machines integrate into an existing production line?
Not Sure Which Machine?
Visit The Factory In Panyu
Our workshop and assembly lines are in Panyu District, Guangzhou. Customers coming to China are welcome to walk the floor, watch a machine run and sit down with the engineers who build it.
- See the five-axis gantry machining centres and Renishaw inspection equipment we use on our own parts.
- Watch machines running on the line, including units in their 72-hour burn-in test.
- Go through your panel drawings and capacity targets face to face with an engineer.
- Take the advanced training programme held at our Guangzhou headquarters.
