How Many Boards Can a Six-Sided Drill Process Per Day?
Practical guide to six-sided drill throughput: real-world numbers, factors affecting capacity, and how to maximize your daily output.

The Short Answer
It depends on the model and your products, but here are real-world numbers:
| Model | Panels/Minute | Panels/8hr Shift |
|---|---|---|
| Double Drill Pack | 6-7.5 | 2,880-3,600 |
| Triple Drill Pack | 6-7.5 | 2,880-3,600 |
| Six Drill Pack (dual channel) | 10-12.5 | 4,800-6,000 |
Note: These numbers assume standard cabinet components with typical hole patterns.
Factors That Affect Throughput
1. Board Size
Smaller boards cycle faster. A 400×300mm drawer side processes faster than a 2400×600mm wardrobe panel.
2. Number of Holes
More holes = longer cycle time. A simple shelf with 8 holes processes faster than a cabinet side with 40+ holes.
3. Loading Method
- Manual loading: Adds 5-10 seconds per board
- Auto-loader: Continuous feed, no waiting
- Conveyor feed: Matched to line speed
4. Operator Skill
Experienced operators load boards faster and handle exceptions more efficiently.
5. Product Mix
Running the same product all day is faster than switching between different sizes and programs.
Maximizing Your Output
- Batch similar products: Group same-size panels together
- Use auto-loading: Eliminates operator fatigue bottleneck
- Pre-program recipes: Store all common products for instant recall
- Maintain your machine: Sharp drills and clean sensors = faster cycles
- Optimize your layout: Minimize distance between loading and unloading
Capacity Planning
When planning your factory capacity:
- Calculate total panels needed per day
- Add 20% buffer for maintenance and breaks
- Choose a machine that exceeds your requirement by 30% (for growth)
Need help sizing your production line? Contact Tuodiao CNC for a free capacity analysis.


